Vancouver, Canada · Completed 2020
| Location | Vancouver, Canada |
|---|---|
| Completed | 2020 |
| Height | 156 m · 512 ft |
| Floors | 52 |
| Use | Residential |
| Structure | Reinforced concrete |
| Developer |
Westbank Corp |
|---|---|
| Architect |
BIG (Bjarke Ingels) Dialog Design |
| Structural engineer |
Buro Happold Glotman Simpson Consulting Engineers |
| MEP |
Integral Group |
| GC |
ICON Pacific Construction |
| MEP engineer |
Cobalt Engineering |
| MEP engineer, engineer of record |
Nemetz (S/A) & Associates |
| Main contractor |
ICON West Construction |
| Electrical |
Mott Electric GP |
| BIM |
CadMakers |
| Planning |
James KM Cheng Architects |
| Concrete supplier |
Ocean Concrete |
| Post-Tensioning supplier |
DYWIDAG DSI |
| Post-Tensioning supplier, rebar supplier |
LMS Reinforcing Steel Group |
Vancouver House, Vancouver. Constrained to a triangular site at the bottom due to a curving access road to the city, the tower starts with a triangular base and then gently cantilevers out to form a top rectangular floor plan, which optimizes residents space. The project is equipped with several sustainability features, including a rain and grey water reuse strategy in both irrigation and non-potable applications, and an urban agriculture plan that incorporates both walls and rooftops (the development features shorter adjacent podium structures as well) to grow food for residents.