Dubai, United Arab Emirates · Completed 2017
| Location | Dubai, United Arab Emirates |
|---|---|
| Completed | 2017 |
| Height | 93 m · 305 ft |
| Floors | 21 |
| Use | Residential / Office / Hotel |
| Structure | Composite |
| Developer |
OMNIYAT |
|---|---|
| Architect |
Zaha Hadid Architects Brewer Smith Brewer Group |
| Structural engineer |
BG&E Brewer Smith Brewer Group |
| Architect of record |
Brewer Smith Brewer Group |
| MEP engineer |
Clarke Samadhin Associates |
| Project manager |
Gleeds |
| Main contractor |
Multiplex |
| BIM |
BG&E |
| Façade |
Alu Nasa Koltay Façades |
| Fire |
Design Confidence |
| Interiors |
Hirsch Bedner Associates |
| Lighting |
DPA Lighting Consultants Illuminate Lighting Design |
| Security |
Control Risks |
| Traffic |
Al Turath Engineering Consultants |
| Commissioning |
AESG |
| Façade, fire |
Ramboll |
| Quantity surveyor |
HQS |
| Steel supplier |
Al Nasr Contracting Co |