Gold Coast, Australia · Completed 2019
| Location | Gold Coast, Australia |
|---|---|
| Completed | 2019 |
| Height | 124 m |
| Floors | 35 |
| Use | Residential |
| Structure | Concrete |
| Developer |
Yuhu Group |
|---|---|
| Architect |
DBI Design Pty Ltd Oppenheim Architecture + Design |
| Other consultants |
Multiplex Fast Flow Systems Pte Ltd (Stormwater Management) |