Seoul, South Korea · Completed 2017
| Location | Seoul, South Korea |
|---|---|
| Completed | 2017 |
| Height | 110 m · 361 ft |
| Floors | 22 |
| Use | Office |
| Structure | Composite |
| Developer |
Amorepacific Corporation |
|---|---|
| Architect |
David Chipperfield Architects Haeahn Architecture KESSON |
| Structural engineer |
Arup CSSE |
| Façade |
Withus |
| Fire |
KFUBIS |
| Geotechnical |
CG ENC |
| Interiors |
David Chipperfield Architects |
| Landscape |
SeoAhn |
| LEED |
Cosentini Associates |
| Lighting |
Huel |
| Quantity surveyor |
LSK |
| Security |
Arup |
| Sustainability |
EEC Engineering Network |
| Vertical transportation |
KEC |
| Wind |
Daewoo E&C Polimi |
| Cladding |
LG Hausys |
| Concrete |
Seoyong |
| Elevator |
thyssenkrupp |
| MEP engineer |
Sukwoo Engineering |
| Project manager |
Kunwon Engineering |
| Main contractor |
Hyundai Engineering & Construction |
| Acoustics |
Chonbuk National University |
| Way finding |
L2M3 Communication Design |
| Flooring |
Ruckstuhl |
| Aluminium |
Hyundai Aluminum |
| Flooring supplier |
Samji Stone |
| Formwork supplier |
PERI |
| Interior partition supplier |
Eagon Industrial Company Kvadrat Schüco Unifor |
| Sealants supplier |
DuPont |
| Also credited |
Arup Himec Genesis Interface |